Loading...

Throughout a project there are a number of challenges facing the construction team that go outside the realm of typical construction practices.  Do you need a structure to get trucks from the street into the heart of a project site?  Need to stabilize a tower crane off of the building?  From complex formwork and shoring to temporary structures and safety lines, Innova’s collaborative approach will bring you a solution that you will be confident using, is safe and OSHA compliant, and offers the project the maximum  savings in time and materials.

02Nov

Quote post only

Curabitur iaculis, ligula facilisis volutpat suscipit, sapien felis tempor, consequat vitae velit.

02Nov

Design Trends in 2015 year

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris non laoreet dui. Morbi lacus massa, euismod ut turpis molestie, tristique sodales est. Integer sit amet mi id sapien tempor molestie in nec massa.

02Nov

Video Post Only


Morbi lacus massa, euismod ut turpis molestie, tristique sodales est. Integer sit amet mi id sapien tempor molestie in nec massa.

02Nov

Minimalistic Design Forever

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Mauris non laoreet dui. Morbi lacus massa, euismod ut turpis molestie, tristique sodales est. Integer sit amet mi id sapien tempor molestie in nec massa.

General Contractor – Atkinson/Clark JV

Fabricator(s) – Beck Steel Inc. & Pfeifer Worldwide

Erector – Pro Steel Erectors

 

Sands Aviation Hangar
Las Vegas, Nevada, U.S.

Project Linq - Las Vegas High Roller
Las Vegas, Nevada, U.S.

Alt

Sinatra Employee Garage Stairs
Las Vegas, Nevada, U.S.

SkyVue Observation Wheel
Las Vegas, Nevada, U.S.

City Center - Artwork Rigging and Erection
Las Vegas, Nevada, U.S.